County
Route 31 -- Heart's Content Road Bridge
This project included
the replacement of two bridges on CR 31 in the Town of Cairo,
New York. Specifically, the bridges were 40 ft and 24 ft. long hy-span,
pre-cast, three-sided systems over the Kiskatom Brook and
Shinglekill,
respectively. Both structures were founded on bored-in-place
steel caissons to rock. The connecting wing walls were constructed
with
steel H-pile and concrete lagging.
Greene County required this project be completed within
one year (design to complete construction). The design team
worked closely with the NYSDOT
liaison and the County and completed Phase I-VI design in
four months and the construction was completed within schedule.
Foit-Albert provided all aspects of design – structural,
hydraulic, and environmental – as well as construction inspection
services. The
NYSDOT liaison commended Foit-Albert on the ability to work
quickly with the established guidelines (i.e., all required
steps in a Phase I-VI design)
and how the firm maintained productive communication with
both the County and the Department.