Route
3 Bridge Replacement over the Salmon River
Foit-Albert Associates
provided a Level III Senior Inspector, Level II Inspector
and Inspector
Trainee, Level I. The reconstruction
work included:
- Replacement
of two existing multiple span bridges with two new bridges
on new horizontal and vertical alignment.
The new bridges consist of multiple spans and multiple
steel girders w/composite concrete deck.
- Construction
of new embankment and highway pavement section on the newly
aligned highway at the approaches
and between
the two bridges.
- Construction of new Closed Drainage system throughout
length of project. Length of project being 1,100
meters.
- Construction of two new traffic signals.
- Milling and overlay of existing pavement beyond newly
aligned highway.
- Construction of new pavement markings and signage.
- Construction of a new fishing access including parking
lot, ramp to dock and new fishing dock.
- New landscaping including topsoil, seeding, sodding
and plantings including bushes and trees.
- Permanent erosion control including heavy and medium
stone fill.
- Construction of new Geosynthetic Reinforced Earth
System (GRES) between stages.