Masthead graphicMasthead graphic
Top left spacer graphicLink to Home PageLink to Contact UsLink to DirectionsLink to Search Our Sitetop right spacer graphic
top left spacer graphic
Content spacer graphic
content left spacer graphic
Go back to Construction Inspection

Replacement of Thruway Mainline Bridge
at Rynex Corners Road, MP 167.03

This project included the replacement of a structure carrying Rynex Corner Road over the Thruway mainline at MP 167.03 with a two-span, 200 foot long, continuous integral abutment structure founded on cast-in-place piles. The midspan pier was also founded on C.I.P piles. Maintenance and protection of traffic for the mainline during construction of the midpsan pier included lane shifts and coordination with the NYS police and NYSTA Traffic Division. The design team provided construction inspection and support services for this project.


Engineering Portfolio - Construction Inspection - Rynex Corners Road Bridge

 

 

Client
New York State Thruway Authority

Services
Construction Inspection Services

 

 
© 2005 Copyright Foit-Albert Associates. All rights reserved.