Masthead graphicMasthead graphic
Top left spacer graphicLink to Home PageLink to Contact UsLink to DirectionsLink to Search Our Sitetop right spacer graphic
top left spacer graphic
Content spacer graphic
content left spacer graphic
Go Back to Highway/Road Design

Mill and Fill Program (Group MF5)

Foit-Albert Associates provided engineering services for the Erie County 2003 Mill and Fill Program (Group MF5). Foit-Albert’s limit of Mill and Fill included Boston State Road, CR227, Springville-Boston Road, CR228 from Boston Colden Road to Sharp Street and Bagdad Road, CR505 from N.Y.S. Route 39 to N.Y.S. Route 62. This fast track program included survey, preliminary design report, contract documents including plans, specifications and cost estimate, bidding services and construction administration including construction inspection.

The project included milling existing asphalt concrete and overlay with new binder and top courses on two two-lane collector roads. Work included improvements to deficient site distances, shoulder backup, replacement of some guide rail, some full depth pavement and shoulder construction, cleaning closed drainage structures, rehabilitation of driveway aprons, pavement stripes and maintenance and protection of traffic. Total length of project is 4.5 miles.


Engineering Portfolio - Roads - Mill & Fill Program

 

 

Client
Erie County
Dept. of Public Works

Professional Services
Engineering Services

 

 
© 2005 Copyright Foit-Albert Associates. All rights reserved.