Reconstruction
of Old Military Road
This project proposes to improve
the roadway geometry by eliminating
sub-standard features along Old Military Road, from its
intersection with NYS Route 86 (northern end) to John Brown
Road (southern end). Numerous sub-standard features are present
within the project
limits,
resulting in limited sight distance, which increases the
potential for traffic accidents. Additionally, this project
will provide a cost
effective pavement treatment for a useful service life
of 20 years, improve various intersections alignment with
Old Military
Road, replace
the deteriorated structure over Chubb River with a new
bridge
that consists of pre-cast concrete box beam superstructure,
concrete abutments
and wingwalls; improve pedestrian access facilities along
the east side of Old Military Road from Newman Rd. to Station
St.; improve
bicycle access accommodations; and provide drainage collection
system within the project limits.
Reconstruction of the road
includes replacing the existing pedestrian facility with
new curbing and five foot wide concrete sidewalks along
the east side of the road, from its intersection with the
Olympic Training Center driveway to Station Street. Pedestrian
crosswalks and other amenities will also be provided. The
total length of the
new pedestrian facility is approximately 1 mile.
Portfolio - Roads -